VWR peqlab PCR Workstation Pro Instruction Manual page 11

Table of Contents

Advertisement

Available languages

Available languages

Instruction Manual PCR Workstation Pro
Connect the sensor cables from the back
panel 2 and the top assembly 6. Put the
power plug of the back panel 2 into the
power outlet of the top assembly 6.
Step 5
Insert the UV tube back in place.
Cover the service access of the top assembly
Top assembly 6
6 with the ventilation cover 7. Screw both
parts together with 6 screws 8. Use the
screw-driver 9.
Ventilation cover 7
Turn the system around 180° and place it on
the site of operation as needed.
Finally connect the system to the power sup-
ply by plugging the power plug
from the back panel 2 into the local power outlet.
The system is now ready for use.
PEQLAB_v0517_E
9

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents