Download Print this page

Mounting The Controller Directly On The Pipe - nvent RAYCHEM ECW-GF Installation Instructions Manual

Digital electronic controller with ground fault

Advertisement

Mounting the RAYCHEM ECW-GF controller directly on the pipe using the optional FTC-PSK pipe stand kit
1
Note: Prepare the heating
cable in the stand following the
instructions included in
the nVent RAYCHEM FTC-PSK kit.
• Fasten stand to pipe with label
facing desired direction of box
opening. Do not pinch heating
cable.
• Loop and tape extra heating
cable to pipe.
2
• Screw transition onto
stand until it stops.
Tighten until slots on
transition and stand
align. Do not damage
threads on transition.
4
• Make sure o-ring is seated in groove
on transition.
• Place box onto transition and install
locknut.
• Tighten locknut.
O-ring
1 in
(25 mm)
Pipe strap
Note: For 1 in (25 mm)
and smaller pipes use
adapter (purchased
separately) and install
between stand and pipe.
JBS-SPA
adapter for
small pipes
Glass
cloth tape
3
• Insert cable tie through
slots on stand and
transition and tighten
firmly to prevent
transition rotation.
• Trim off extra cable
tie.
Trim
Position
adapter
this side
up.
nVent.com | 3

Hide quick links:

Advertisement

loading