classified as positive electrode and negative one. All should be connected to the connecting
poles at the back of controller accordingly.
b. The anemoscope should be installed on house roof or open areas, and must be vertical against
the ground. One end of the matched cable of anemoscope should be inserted into the socket
under the anemoscope with the other end inserted into the socket accordingly.
c. Please refer to annex 2 for controller specification
2. On-grid electric wiring
All the models can be applied to on-grid environment. But it is approved by local regulations.
What is more, on-grid controller and inverter need to be purchased additionally.

Maintenance

Wind turbine may be operated under extremely harsh environment, or meet various complicated
weather. Therefore, fix- date examination and maintenance are necessary in order to keep the
system operate rightly.
Do the following check every three months:
1. Check the tight wire is too loose or too tight, and adjust them, in particular in initial stage of
installation and post-gale.
2. Check whether or not the wire is damaged or loose. The joints are loose and rusted or not in
order to secure electrical safety.
3. Maintain the batteries following the battery manual.
4. Before storm, it is better to lay down the tower for escaping from unpredictable loss
15