Configuration Specification Of Batteries; Installation Specification Of Guyed Tower - Yangzhou Shenzhou Wind-driven Generator FD2.1-200-8L User Manual

Wind generator up to 20000w
Table of Contents

Advertisement

Model
Ground depth(m)
Ground diameter(m)
Burial depth of cotter bolt (m)
Layout diameter of cotter bolt
(mm)
Specification of cotter bolt
Quantity of cotter bolt
Step 3: Assembly of tower and generator
Please refer to the installation specification of guyed tower (Step 4)
Step 4: Hoisting the tower
A hoist is needed while installing the guyed tower, which will be proceeded by professional
personnel. Non-working people should be far away from the site when hoisting.
1. Utilized by supporter on the upper side of pole and hoist gradually.
2. When the tower has been erected, face the open hole on tower base to the cotter bolt and
screw down the bolt nut.

Configuration Specification of Batteries

1. Batteries should be placed inside buildings under dry and constant temperature. After finalizing
the quantity of batteries in series, it is necessary to have a design to place the batteries,
controller and inverter.
2. Connect the batteries in series. The concrete way is to connect the anode of first battery to
cathode of the second one.
3. Make the joints greased. Install the fuse on the positive electrode of battery. The distance of
conducting wire between batteries and controller should be less than 3m.
Code in the
1000W
graph 8
( D1)
1.2
( C1)
1.0
( D2)
0.8
( C2)
450
( T)
M18
( N)
12
Table 2
2000W
3000W
5000W
1.5
1.5
1.0
1.2
1.2
1.2
600
600
M18
M20
12
12
10KW
20KW
1.6
2.0
3.0
1.5
1.8
2.5
1.2
1.6
2.0
700
1000
1200
M24
M24
M30
12
16
16
13

Advertisement

Table of Contents
loading

Table of Contents