Yangzhou Shenzhou Wind-driven Generator FD2.1-200-8L User Manual page 10

Wind generator up to 20000w
Table of Contents

Advertisement

7. Cover the dome.
8. (For 3kw and above 3kw wind turbine) infix the aviation plug on the generator into the socket of
dogvane, and then install the dogvane. Special attention should be paid to the direction of
dogvane. All the five holes must be face-to-face.
Step 5: Preparations before erecting the tower
(For 3kw and above 3kw wind turbine)
1. Fix the fixed cable wire on the tower. The cable wire (both right and left sides) should be directly
connected to side anchor through turnbuckle. Cable wire behind should be fixed on back
anchor according to the same length. Make sure there is no twist among the three cable wires
2. Connecting the two supporting poles.
3. Fix the two relative thin cable wires on the two ears of supporting pole, and then make the cable
wire before the tower drill through the two ears, and fix them after putting into the upper pulley.
4. Insert the supporting pole into the tower. The cable wire on the two ears should be fixed on the
two side anchors, and then fixed by tighter.
Graph 6
10