e-mail:dzd@dzd.cz Read carefully the below instructions prior to the installation of the heater! Dear Customer, The Works Cooperative of Dražice – Machine Plant, Ltd., would like to thank you for your decision to use a product of our brand. With this guide, we will introduce you to the use, construction, maintenance and other information on indirect water heaters.
(hours) contents from 15°C to 65°C in 6,88 0,55 OKHE 80 OKHE 100 6,96 0,87 OKHE 125 6,77 1,05 OKHE 160 Servicing The service devices of the heater are located under the plastic guard of the control panel.
The room in which the appliance will be operated, must be frost-free. The appliance has to be mounted at a convenient place, it means that the appliance must be easily available for potential necessary maintenance, repair or replacement, as the case may be. If water is strongly calcareous we recommend that any of the common decalcifying devices was installed with the appliance, or the thermostat to be set to minimum operation temperature of 60 (setting to position “60“).
Page 6
We recommend that the hot water distribution from the heater was as short as possible to minimise heat losses. Heaters must be provided with a discharge valve mounted on the cold service water inlet to the heater for potential disassembly or repair. When assembling the security equipment, follow ČSN 06 0830.
First putting into operation Before opening the power supply, the tank must be filled with water. During the heating process the pressurised connection water that increases its volume due to heating must drip off the safety valve, in non-pressurised connection it drips off the overflow combination faucet. Warning: The process of first heating must be executed by licensed professional who has to check it.
Warning! In doing so, the cold water supply pipe and the connection fitting of the tank may get heated! If the hot water heater does not work, or if hot water is not withdrawn, no water shall drip off the safety valve.
Page 9
Disposal of packaging material and functionless product A service fee for providing return and recovery of packaging material has been paid for the packaging in which the water heater was delivered. The service fee was paid pursuant to Act No. 477/2001 Coll., as amended, at EKO-KOM a.s.
Need help?
Do you have a question about the OKHE 100 and is the answer not in the manual?
Questions and answers