Mira Coda PRO ERD Installation & User Manual page 8

Thermostatic bar valve
Table of Contents

Advertisement

9. Caution! It is essential at this point that
the supply pipework is thoroughly flushed
through before connection to the bar valve.
10. Install the concealing plates,and tighten the
concealing plates until they are flush with the
finished wall.
11. Make sure that the sealing washer/filter is
fitted, offer the bar valve up to the offset
connectors and tighten the nuts.
Caution! Take care not to damage the chrome
plated surfaces.
12. Install the diverter and rigid riser assembly,
go to section: 'Diverter and Rigid Riser
Assembly Installation'.
13. Install the shower fittings.
14. Turn on the hot and cold water supplies and
check for leaks.
15. Before using the shower, refer to section:
'Commissioning'.
Sealing Washer/Filter
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents