Mira Atom User Manual

Mira Atom User Manual

Thermostatic bar valve

Advertisement

mIra atom eV
thermostatIc Bar ValVe
InstallatIon & User GUIde
These instructions must be left with the user.
1

Advertisement

Table of Contents
loading

Summary of Contents for Mira Atom

  • Page 1 Bar ValVe InstallatIon & User GUIde These instructions must be left with the user.
  • Page 2: Table Of Contents

    Pressures knob controls the flow and the other knob controls temperatures the temperature. the mira atom eV is supplied complete with mira thermostatic shut-down l14a shower Fittings. connections the thermostatic bar valve incorporates a wax...
  • Page 3: Safety Warnings

    WarnInGs PacK contents mira thermostatic mixers are precision engineered tick the appropriate boxes to familiarise yourself and should give continued safe and controlled with the part names and to confirm that all of the performance, provided: parts are included.
  • Page 4: Specifications

    offset connector (inlet centres are 150 mm sPecIFIcatIons ± 24 mm). Pressures ¾" BSP • connection to Bar Valve max static Pressure: 10 Bar. • max maintained Pressure: 5 Bar. • min maintained Pressure: (Gas Water heater): 1.0 Bar (for optimum performance supplies ½"...
  • Page 5: Installation

    5. Pipework dead-legs should be kept to a InstallatIon minimum. 6. decide on a suitable position for the mixer. Suitable Plumbing Systems the position of the mixer and the shower fittings must provide a minimum gap of 25 mm Gravity Fed: between the spill-over level of the shower tray/ the thermostatic mixer must be fed from a cold bath and the showerhead (refer to illustration).
  • Page 6: Installing The Thermostatic Mixer

    Installing the Thermostatic Mixer 3. tighten the offset connectors using a spanner on the spanner flats. make sure that the the thermostatic bar valve should be installed connectors are level and set at the correct where it will be supported by fixed pipework. For distance apart, using the bar valve as a guide unfixed pipework a wall mounting bracket must to spacing.
  • Page 7: Commissioning

    8. Refit and tighten the fixing screw, refit the commIssIonInG concealing cap. Maximum Temperature Setting Before using the shower the maximum temperature must be checked to make sure that it is at a safe level. It has been preset to a safe showering temperature under ideal conditions at the factory, appropriate for most systems.
  • Page 8: Operation

    User maIntenance If you require a mira trained service engineer or Adjusting the Temperature agent, refer to section: ‘Customer Services’. the temperature is controlled by rotating the temperature knob. Fault Diagnosis For safety reasons, the temperature is limited by an override stop.
  • Page 9: Lubricants

    Lubricants Maintaining the Non-Return Valves silicone based lubricants must only be used on the non-return valves are located in the the rubber seals. thermostatic bar valve body, and are accessible through the inlet connectors. Caution! oil based or other lubricant types may cause rapid deterioration of seals.
  • Page 10: Spare Parts

    sPare Parts Note! all spare parts are supplied individually unless stated otherwise. 1630.049 Filter / Washer (x2) 1663.113 non return Valve (x2) 1663.112 offset connector Kt (x2) 1663.117 Flow cartridge 1630.048 outlet connector 1663.118 Flow Knob assembly 1663.116 temperature Knob assembly 1663.115 temperature stop...
  • Page 11: Notes

    notes...
  • Page 12: Customer Service

    Our Service Force is available to provide a quality service of limescale. at a reasonable cost. You will have the assurance of a Mira Damage or defects if the product is taken apart, repaired or trained engineer/agent, genuine Mira spare parts and a modifi...

This manual is also suitable for:

Atom ev

Table of Contents