1.2. Startup the Data Processing Unit

Sample image of DPU
3
1.3. Shut down / Reboot the Radar System
If turned off the circuit breaker in the Junction Unit (JCU), the radar system will also be off.
Process of the Data Processing Unit operation is necessary when shut down the Antenna Unit. Moreover,
restart ATU in case of having problem for example the radar is hanged up.
Caution: It may break down if remove a plug or turn off a breaker without following this process.
Shut down the circuit breaker in the Junction Unit.
1
4
2
1. Setup Data Processing Unit
(1) Connect AC power supply cord from
electrical outlet to DPU, and turn ON the
power. (Turn ON the power of ATU before
turn ON the power of DPU)
(2) Connect LAN cable from DPU to ATU (SPU),
and setup IP address of DPU. (192.168.31.110)
(3) Use USB / LAN adapter if only 2 LAN
connectors are mounted. Connect
(MONI-CON), and setup IP address of DPU.
(192.168.1.80)
(4) Connect LAN cable from router to DPU for using
Internet. (e.g.: 192.168.0.5)
Notice: Do not use the same IP address as ATU.
2. Turn on the power of the Data Processing Unit.
Username: radar
Password: radar
(1) The display software starts automatically.
(2) Click [Connect] to start radar operation.
(3) Click the [Start emission] to start
observation and to display radar images.