Ibm San50C-R Fabric Switch Rack-Mount Kit; San50C-R Switch - IBM SAN50C-R Installation, Service And User Manual

Ibm storage networking
Table of Contents

Advertisement

Note: When installing or replacing the unit, the ground connection
must always be made first and disconnected last.
CAUTION:
All power supplies must be grounded. The receptacles of the AC
power cables used to provide power to the chassis must be the
grounding type, and the grounding conductors should connect to
protective earth ground at the service equipment. For a IBM
SAN50C-R switch with a DC power supply, a grounding cable
must be connected to the terminal block.
If a 110-VAC input is chosen, order a 110-VAC power cord separately. Table 1-1
lists the items provided in the IBM SAN50C-R mounting kit used for installing the
switch.
Table 4. IBM SAN50C-R Fabric Switch Rack-Mount Kit
Description
Front Rack-Mount Bracket Kit
Front rack-mount brackets
M4 X 6-mm Phillips flat-head screws
12-24 X 3/4-inch Phillips binder-head screws
10-32 x 3/4-inch Phillips binder-head screws
Cable Management Bracket Kit
Cable guide
M4 X 6-mm Phillips pan-head screws
Rear Rack-Mount Bracket Kit
30- to 36-inch slider rails
24- to 30-inch slider rails
18- to 24-inch slider rails
12-24 X 3/4-inch Phillips binder-head screws
10-32 X 3/4-inch Phillips binder-head screws
C brackets
M3 X 6-mm, Phillips flat-head screws
12-24 cage nuts
To install the IBM SAN50C-R chassis in a rack using the mounting kit provided
with the switch, follow these steps.
1. Install the front rack-mount bracket as follows:
a.
Position one of the front rack-mount brackets against the side of the switch
and align the screw holes as shown in the following graphic.
Quantity
2 per kit
8 per kit
8 per kit
8 per kit
2 per kit
2 per kit
2 per kit
2 per kit
2 per kit
8 per kit
8 per kit
2 per kit
4 per kit
16 per kit
Chapter 2. Installing the IBM SAN50C-R switch
17

Advertisement

Table of Contents
loading

Table of Contents