Boiler Location - Baxi LUNA DUO-TEC 1.70 User Manual

Hide thumbs Also See for LUNA DUO-TEC 1.70:
Table of Contents

Advertisement

Available languages

Available languages

4.1.4
Flue termination location
D
E
B
L
V
A
Clearance above grade, veranda, porch, deck, or balcony
B
Clearance to window or door that may be opened
C
Clearance to permanently closed window
Vertical Clearance to ventilated soffit located above the terminal within a horizontal
D
distance of 2 feet (610 mm) from the center line of the terminal
E
Clearance to unventilated soffit
F
Clearance to outside corner
G
Clearance to inside corner
H
Clearance to each side of center line extended above meter/ regulator assembly
I
Clearance to service regulator vent outlet
Clearance to non-mechanical air supply inlet to building or the combustion air inlet
J
to any other appliance
K
Clearance to mechanical air supply inlet
L
Clearance above paved sidewalk or paved driveway located on public property
M
Clearance under veranda, porch, deck or balcony
For clearances not specified in ANSI Z223.1/NFPA 54 or CSA B149.1, clearance will be in accordance with local installation codes and
*
the requirements of the gas supplier and these installation instructions.
A vent shall not terminate directly above a sidewalk or paved driveway that is located between two single family dwellings and serves
(1)
both dwellings.
(2)
Permitted only if veranda, porch, deck or balcony is fully open on a minimum of one side beneath the floor.
Note:
Local Codes or Regulations may require different clearances. The flue termination must be exposed to the external air and the
position must allow the free passage of air across it at all times. In certain weather conditions the termination may emit a plume of
steam. Avoid positioning the termination where this may cause a nuisance.
5.

BOILER LOCATION

The boiler is not suitable for outdoor installation.
The boiler must be installed on a flat vertical wall which is capable of supporting the weight of the boiler.
The boiler may be installed in any room or internal space, although special attention to the requirements of the current electrical
provisions with respect to the installation of the boiler in a room or internal space containing a bath or shower. Where a room-
sealed boiler is installed in a room containing a bath or shower, it must not be possible for a person using the bath or shower to
touch any electrical switch or boiler control utilizing line voltage electricity.
The boiler may be installed in a cupboard or compartment, provided it is correctly designed for that purpose.
7703477.01 (1-03/18)
C
V
Fixed
Closed
V
F
Operable
B
VENT TERMINAL
Vent Termination Minimum Clearances
INSIDE CORNER
DETAIL
G
V
A
B
B
Fixed
Operable
Closed
V
B
V
J
AREA WHERE TERMINAL
AIR SUPPLY INLET
22
H
I
V
M
V
IS NOT PERMITTED
USA
12" (305mm)
12" (305mm)
12" (305mm)
*12" (305mm)
*12" (305mm)
18" (457mm)
18" (457mm)
18" (457mm)
18" (457mm)
9" (229mm)
6" (152mm)
3 ft. (0.9m) within a
3 ft. (0.9m) within a
height of 15 ft. (4.5m)
height of 15 ft (4.5m)
above the meter/
above the meter/
regulator assembly
regulator assembly
3 ft. (0.9m)
12" (305mm)
*3 ft. (0.9m)
*7 ft. (2.1m)
7 ft. (2.1m)
*12" (305mm)
2
12" (305mm)
K
CANADA
3 ft. (0.9m)
9" (229mm)
6" (152mm)
3 ft. (0.9m)
3 ft (0.9m)
6 ft. (1.8m)
1
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna duo-tec 1.110

Table of Contents