Separated Flue Terminations; Two Pipe Vent Support - Baxi LUNA DUO-TEC 1.70 User Manual

Hide thumbs Also See for LUNA DUO-TEC 1.70:
Table of Contents

Advertisement

Available languages

Available languages

Separated flue terminations

LUNA DUO-TEC 1.70
I
L max = 32' 3 3/8" / 10 m
L
L max = 32' 3 3/8" / 10 m
M
L max = 29' 6" / 9 m
Spring Clamp Instructions
Baxi requires the use of the spring clamp at every push-fit gasket connection when
using their polypropylene vent. Please follow the instructions below when utilizing
the spring clamps:
• Take the Baxi dual flue spring clamp with the larger hole in it and place it onto the
male end of the pipe.
• Slide clamp all the way down the pipe with the smaller opening of the clamp
towards the female end of the pipe.
• Bend the clamp over the female end of pipe "A" and slide the male end of pipe "B"
through the clamp and into the female end of pipe "A".
NOTICE
This clamp is needed for Baxi dual flue pipe. The dual flue spring clamp is for indoor use only and should not be used
in an outdoor application.

Two Pipe Vent Support

All venting must be supported every 39" (1 m) with a fixed clamp.
A: steel strapping or equivalent
A
7703477.01 (1-03/18)
LUNA DUO-TEC 1.110
L max = 32' 3 3/8" / 10 m
L max = 32' 3 3/8"/ 10 m
L max = 29' 6" / 9 m
20
L
L
L
L
I
M

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna duo-tec 1.110

Table of Contents