G2102 C CONVECTION OVEN RANGE
G2112 C & G2112 C/2 CONVECTION
OVENS
INSTALLATION and SERVICING INSTRUCTIONS
These appliances must be installed and serviced by a competent person as stipulated by the Gas
Safety (Installation & Use) Regulations.
IMPORTANT
The installer must ensure that the installation of the appliance is in conformity with these instructions and
National Regulations in force at the time of installation. Particular attention MUST be paid to –
BS7671 I.E.E. Wiring Regulations
Electricity At Work Regulations
Gas Safety (Installation & Use) Regulations
Health And Safety At Work etc. Act
Local and National Building Regulations
Fire Precautions Act
The appliances have been CE-marked on the basis of compliance with the Gas Appliance Directive, EMC
and Low Voltage Directive for the Countries, Gas Types, Gas Pressures and voltages as stated on the
Data Plate.
WARNING - TO PREVENT SHOCKS, ALL APPLIANCES MUST BE EARTHED
On completion of the installation, these instructions should be left with the Engineer-in-Charge for reference
during servicing. Further to this, The Users Instructions should be handed over to the User, having had a
demonstration of the operation and cleaning of the appliance.
IT IS MOST IMPORTANT THAT THESE INSTRUCTIONS BE CONSULTED BEFORE INSTALLING AND
COMMISSIONING THIS APPLIANCE. FAILURE TO COMPLY WITH THE SPECIFIED PROCEDURES
MAY RESULT IN DAMAGE OR THE NEED FOR A SERVICE CALL.
PREVENTATIVE MAINTENANCE CONTRACT
In order to obtain maximum performance from this unit we would recommend that a Maintenance Contract
be arranged with SERVICELINE. Visits may then be made at agreed intervals to carry out adjustments and
repairs. A quotation will be given upon request to the contact numbers below.
Falcon Foodservice Equipment
Head Office and Works
Wallace View, Hillfoots Road, Stirling, FK9 5PY, Scotland.
Serviceline
PHONE: 01438 363 000
WEEE Directive Registration No. WEE/DC0059TT/PRO
At end of unit life, dispose of appliance and any replacement parts in a safe manner,
via a licensed waste handler.
Units are designed to be dismantled easily and recycling of all material is encouraged
whenever practicable.
Detailed recommendations are contained in
Institute
Of Gas Engineers published documents:
IGE/ UP/ 1, IGE/ UP/ 2
BS6173 and BS5440
T100970 Ref.2