Nibe UKV 20-220 Installation And Operating Manual page 6

Buffer tanks
Hide thumbs Also See for UKV 20-220:
Table of Contents

Advertisement

INSTALLATION AND OPERATING MANUAL
2
4
11
10
6
10
9
Fig. 8 Secti on of the UKV 20-750 and 20-1000 buff er tank
1.
Vent.
2.
Upper tank insulati on.
3.
Connector pipe (heati ng system supply).
4.
Connector pipe (supplying from the heat source).
5.
Temperature sensor cover.
6.
Steel tank.
7.
Tank insulati on.
8.
Connector pipe (return from the heati ng system)..
6
16
1
3
14
5
10
5
10
5
15
7
8
12
13
Fig. 9 Side view of the UKV 20-750 and UKV 20-1000 buff er tank
9.
Connector pipe (return to the heat source).
10. Connector pipe.
11. Water gate.
12. Lower tank insulati on.
13. Adjustable foot.
14. Thermometer
15. Connector pipe for mounti ng electric heati ng unit.
16. Tank cover.
Buff er tanks
UKV 20-220/300/500/750/1000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ukv 20-300Ukv 20-750Ukv 20-1000Ukv 20-500

Table of Contents