Extra climate system for nibe f1145, f1155, f1245, f1255, f1345, f370, f470, f750, vvm310, vvm320, vvm500, smo40 (17 pages)
Summary of Contents for Nibe GV-HR110
Page 1
N I B E A / S S v e r i g e s v e j 6 D K - 6 1 0 0 H a d e r s l e v T l f . : + 4 5 7 3 5 3 2 7 0 0 w w w. N I B E . d k NIBE AB Sweden · Box 14 · Hannabadsvägen 5 · SE-285 21 Markaryd · www.NIBE.eu...
Reheating of the supply air ............. 8 Electric installations ................ 9 Control and settings of the facility........... 9 Optimal adjustment of the facility............ 9 Facility maintenance ..............10 Troubleshooting ................12 Electric wiring diagram ..............13 CE-conformity marking ..............15 Subject to Technical Modifications of GV-HR110...
Page 3
Follow the instruction in this manual. If the drain is not fall below 0 C°, then the waterseal must be protected set up in accordance with the manual, NIBE will not against frost with a thermostat and an electric heating...
GV-HR110 - Assembly GV-HR110 is delivered upright or as horisontal. The aggregate must be assembled on a vibrationfree, firm substrate (cement, brick, etc.) or onto a solid wall. Since the aggregate can produce up to 6 litres of water per day during the winter months it must be placed...
Concealed wall mountings GV-HR110 is delivered with universal wall mountings consisting of 2 rails. Wall assembly GV-HR110 can also be mounted directly on the wall with visible or concealed wall mountings. Cabinet assembly GV-HR110 is made for mounting in Visible wall mountings a normal 60 x 60 cm cabinet, as shown in the drawing.
Exhaust air connection: The duct systems from the aggregate to the exhaust air hood/exhaust air grid outdoors. Optimal operation of the GV-HR110 is achieved by mounting a connector piece Ø160 mm in each of the GV-HR110 four outlets as the first stepp of the duct system. The connectors are tightened with the supplied collar bands.
Forkert isolering af kanaler Insulation of ducts, alt. B Incorrect insulation of ducts Isolering af kanaler, alt. B that damage from condensation is avoided. Subject to Technical Modifications of GV-HR110...
The control sensor for the electric reheater is mounted in the supply air duct approx. 500 mm behind the electric reheater so that it will not be affected by the radiant heat from the heating element. Subject to Technical Modifications of GV-HR110...
4-7 turns, depending on how close to the aggregate they are. 6: If a postheater is assembled (not sold by NIBE) on the facility set the incoming air temperature to 0-3 °C below the room temperature of the residence.
”Enter” for 10 to 15 seconds until the NIBE-logotype flashes once again and the facility is back to normal operation. If you want to clean the filter at another time interval, this...
Page 11
N.B. Do not mix the units up when many are cleaned at the same time. The four outermost screws that hold the fans in 60.7 place must be removed in order to remove the fans. Subject to Technical Modifications of GV-HR110...
- No circulation of hot water to the waterborne postheater. (Only facilities with mounted waterborne postheaters). - Fouled circulation pump, air in the hot water pipe, faulty thermostat/motor valve, faulty setting of control panel. Subject to Technical Modifications of GV-HR110...
0-10V Belimo bypass H9 = (R10) Fan, supply air 230VAC/bypass L17=0-10V extract air fan and H16= (R8) AUX relay 230VAC max. 20W 0-10V supply air fan H17= (R9) AUX relay 230VAC max. 20W 08-04-2014 Subject to Technical Modifications of GV-HR110...
Page 14
Aux. relay R8 0-10V 1x230V 50Hz Black Belimo ONLY control current Bypass Aux. relay R9 1x230V 50Hz EC fan ONLY control current Yellow Extract air 0-10V Blue Yellow 0-10V Blue EC fan Supply air 08-04-2014 Subject to Technical Modifications of GV-HR110...
C. Huvednr 066033, 066039, 066046, 066047, 912001, 912002 Under forutsättning att Nibe Energy Systems monteringsanvisningar har följts / on the assumption that the mounting instructions from Nibe energy Systems have been followed / bei Voraussetzung dass die Montagean- weisungen von Nibe Energy Systems gefolgt wurden Har tillverkats i överensstämmelse med / is made according to /...
Page 16
AIT France, 10 rue des Moines, 67500 Haguenau Tel : 03 88 06 24 10 Fax : 03 88 06 90 15 E-mail: info@nibe.fr www.nibe.fr Tel : 03 88 06 24 10 Fax : 03 88 06 90 15 E-mail: info@nibe.fr www.nibe.fr...