Preparation And Setup; Mounting The First Stage Onto The Cylinder Valve (Yoke Connector) - Kirby Morgan 200-120 User Manual

Balanced scuba regulator
Table of Contents

Advertisement

Preparation and Setup

Factory prescribed service for this regulator as-
sembly must be performed at least once each year
by a factory trained technician who is employed by
an Authorized KMDSI Dealer. Repair, service, disas-
sembly, or first stage adjustment must not be at-
tempted by persons who are not factory trained and
authorized by KMDSI.
Do not leave a cylinder standing unsecured with
the regulator attached to the valve. Doing so may
cause permanent damage to the regulator and cyl-
inder valve if the cylinder falls over against the first
stage.
Preparation and Setup
KMDSI recommends that you bring your regulator assembly to
your Authorized KMDSI Dealer for the installation of any acces-
sory items, including instrumentation, LP quick disconnect hoses,
and alternate air sources. Your dealer can also answer any ques-
tions you may have pertaining to the information in this guide.
1. If the adjustment knob has been turned "out" (counter-clock-
wise), turn it "in" (clockwise) until a clicking noise can be
heard. This indicates full spring pressure has been acheived.
2. If you are using a standard cylinder with a yoke connector
valve, inspect the cylinder valve O-ring for any wear or dam-
age.
Mounting the First Stage Onto the Cylinder
Valve (Yoke Connector)
1. Partially unscrew the yoke screw of the first stage regulator so
that the dust cap can be removed from the filter and air inlet.
2. With the cylinder valve facing away from you, release a small
amount of air from the cylinder. When air is heard exiting,
18
© MMXVII Kirby Morgan Dive Systems, Inc. All rights reserved. Document # 170814005
B CAUTION
B CAUTION

Advertisement

Table of Contents
loading

This manual is also suitable for:

200-125Balanced scuba regulator

Table of Contents