7.4.4. Setting the Connections
↓
7.4.5. Transferring the Tag Data
Link Parameters
↓
7.5. EtherNet/IP Communication
Status Check
↓
7.5.1. Checking the Connection
Status
↓
7.5.2. Checking the Sent and
Received Data
7.EtherNet/IP Connection Procedure
Associate the tags of the target device with the tags
of the originator device.
Transfer the set tag data link parameters to PLC.
Confirm that the EtherNet/IP tag data links operate
normally.
Check the connection status of the EtherNet/IP
network.
Check that the correct data are sent and received.
11