Mounting The Power Supply; Mandatory Leak Test - Pentair SMART UV EU18-U Installation And User Manual

Uv disinfection sterilizer
Hide thumbs Also See for SMART UV EU18-U:
Table of Contents

Advertisement

INSTALLATION

Mounting the Power Supply

Depending on the style of power supply cylinder or
rectangle the SMART UV
be mounted two ways, mounting tabs at the corner
of the ballast or using the mounting clamps for the
cylinder type of ballast. The power supply should
always be mounted to a surface that is sheltered from
rain, splashing, heavy condensation or any other kind
of prolonged contact with water.
NOTE: DO NOT mount the power supply in an
extremely confined space where heat and moisture
can be retained.
Your UV system will include one of two different
power supplies based on the wattage of your unit:
• 50W, 80W and 120W UV systems include a
rectangular power supply. Four screws, one in
each corner of the power supply, secure the power
supply to the wall or shelf.
• 150W UV systems include a cylindrical power
supply that must be mounted with the two pipe
clips packaged with the unit.
A single screw at the base of the pipe clip secures it
to the wall or shelf. The power supply is then locked
into the pipe clip by securing the retaining strap onto
the clip.

Mandatory Leak Test

A leak test should be performed each time the quartz
sleeve is installed inside the unit's vessel or when the
quartz sleeve or gaskets are replaced [Once annually].
Performing a leak test is a precautionary measure
that will determine whether or not the critical seal
between the quartz sleeve and quartz sleeve module
has been achieved.
Failure to achieve a proper quartz sleeve/quartz
sleeve module seal during SMART UV Disinfection
Sterilizer operation will allow water to leak into the
inside of the quartz sleeve, potentially damaging the
UV lamp and other electrical components, which
could develop into dangerous situations.
system's power supply can
®
IMPORTANT NOTE: Failure to perform a leak test
could lead to conditions that will void your product
warranty.
To Perform Mandatory Leak Test:
1. Prepare the UV system for permanent operation
by plumbing it in-line, into a filter system using the
plumbing hardware of your choice. If PVC glue is
used, follow the glue manufacturer's instructions.
2. If UV lamp is installed, with the unit plumbed for
operation and the clear quartz sleeve module
securely in place, remove the UV lamp from the
quartz sleeve module.
3. Roll-up a few paper towels creating a core
approximately
then slide into the open quartz sleeve module port.
Insert about 6-inches of the paper towel core down
into the quartz sleeve, as shown.
4. With the paper towel in place, turn on the pump
and recirculate water through the UV vessel for at
least thirty (30) minutes.
5. After thirty (30) minutes of recirculating water
through the UV vessel, remove the paper towels
from the quartz sleeve module. Inspect closely for
moisture. If the paper towel is completely dry, your
leak test is complete and successful.
If moisture is detected on the paper towel the quartz
sleeve's rubber gasket and O-ring have failed to
achieve a seal and must be re-assembled; repeat
the leak test until a seal is achieved. See page 4 for
assembly instructions.
SMART UV® UV DISINFECTION STERILIZER Installation and User's Guide
3 / 4
inch diameter, 10-inches long
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents