Goulds SP035V Installation, Operation And Maintenance Instructions page 10

Single phase sump, effluent and sewage
Table of Contents

Advertisement

Available languages

Available languages

TYPICAL INSTALLATIONS (continued)
A 230 VOLT SYSTEM
REQUIRES A 4 WIRE
Simplex Single Phase Wiring Diagram S10020
POWER SUPPLY LINE
L1, L2, N AND GND.
WITHOUT A NEUTRAL THE
115/230 VAC (FOR 115 VAC, USE TERMINALS L1 AND N, JUMP L2 AND N).
CONTROL CIRCUIT
SINGLE PHASE, 60 Hz
WILL NOT WORK.
A 230 VOLT SYSTEM
REQUIRES A 4 WIRE
POWER SUPPLY LINE
L1, L2, N AND GND.
WITHOUT A NEUTRAL THE
CONTROL CIRCUIT
WILL NOT WORK.
Typical Simplex Installation
TO ELECTRICAL
ACCESS
CONTROLS OR
COVER
OUTLET
VENT
INLET
RECEIVER BASIN
SUBMERSIBLE
WASTEWATER PUMP
10
N
NOTE: WHEN USING SEPARATE 115 VAC CONTROL POWER SUPPLY, REMOVE
J1
GND
JUMPER (J1) FROM TERMINALS (L1) AND LL1). CONNECT 15 AMP MAX.
PROTECTED 115 VAC SUPPLY TO TERMINALS (LL1) AND (N) WITH
THE NEUTRAL OF THE SUPPLY TO (N).
LL1
CONTROL
ON-OFF
S1
L1
S1-AUX
L2
N
1
2
NOTE: WHEN USING SEPARATE 115 VAC CONTROL POWER SUPPLY, REMOVE
GND
J1
JUMPER (J1) FROM TERMINALS (L1) AND LL1). CONNECT 15 AMP MAX.
OFF FLOAT
ON FLOAT
PROTECTED 115 VAC SUPPLY TO TERMINALS (LL1) AND (N) WITH
LL1
THE NEUTRAL OF THE SUPPLY TO (N).
CONTROL
ON-OFF
4
ALARM FLOAT
TEST
S1-AUX
1
2
3
OFF FLOAT
ON FLOAT
4
ALARM FLOAT
TEST
5
HIGH LEVEL ALARM
J1
L1
L2
LL1
N
FOR 115 VAC OPERATION,
2
USE TERMINALS L1 AND N,
JUMP TERMINALS L2 AND N.
5
HIGH LEVEL ALARM
115/230 VAC
DRY CONTACTS
2
SINGLE PHASE
60 Hz
SWING
CHECK
SHUT-OFF
VALVE
VALVE
DISCHARGE
FLOAT
SWITCH
RUN
T1
HAND
PUMP
T2
OFF
S1
3
AUTO
FLASH HIGH
FLASHER
R1
R2
HORN
RUN
SILENCE
HAND
R2
OFF
S1
R2
AUTO
FLASH HIGH
FLASHER
R1
R1
R2
HORN
SILENCE
6
R2
R2
DRY CONTACTS
1
2
3
4
5
6
T1
T2
R1
R1
6
DRY CONTACTS
ALARM
FLOAT
PUMP
ON FLOAT
OFF FLOAT
Typical Duplex Installation
DUPLEX CONTROL SYSTEM
VENT
DISCHARGE
CHECK
VALVE
DISCHARGE
INLET
3
rd
2
nd
1
st
FLOAT SWITCH
ISOLATION
VALVE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents