Prerequisite
Relevant cables should be deployed before the PC8910A cabinet is placed. Otherwise, it
may be difficult to deploy the cables.
Context
For the internal layout of the PC8910A cabinet, see
Figure 5-2 PC8910A Layout
The PC8910A cabinet can be configured with two packs of batteries and each battery
pack has four 12 V batteries in serial connection. Refer to the followings to ensure that the
dimensions and weight of the selected batteries are applicable to the PC8910A cabinet
before these batteries are installed into the PC8910A cabinet:
l
Every battery rack supports 260 kg at most, meaning that each battery is 65 kg at
most.