(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYS-
TEM PROVIDED
When the manufacturer of Product Approved side wall horizon-
tally vented gas equipment provides a venting system design or
venting system components with the equipment, the instructions
provided by the manufacturer for installation of the equipment
and the venting system shall include:
1. Detailed instructions for the installation of the venting system
design or the venting system components; and
2. A complete parts list for the venting system design or venting
system.
(d) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYS-
TEM NOT PROVIDED
When the manufacturer of a Product Approved side wall horizon-
tally vented gas fueled equipment does not provide the parts for
venting the flue gases, but identifies "special venting systems",
the following requirements shall be satisfied by the manufacturer:
1. The referenced "special venting system" instructions shall be
included with the appliance or equipment installation instruc-
tions; and
2. The "special venting systems" shall be Product Approved by the
Board, and the instructions for that system shall include a parts
list and detailed installation instructions.
(e) A copy of all installation instructions for all Product Approved
side wall horizontally vented gas fueled equipment, all venting in-
structions, all parts lists for venting instructions, and/or all venting
design instructions shall remain with the appliance or equipment
at the completion of the installation.
[End of Extracted Information From 248 CMR 5.08 (2)]

2 INSTALLATION

2.1 Introduction

This Chapter provides the descriptions and procedures neces-
sary to unpack, inspect and install the
AR 3000 and AR 4000.

2.2 Receiving the unit

Each Array Boiler System is shipped as a single crated unit. The unit
must be moved with the proper lifting equipment for safety and to
avoid equipment damage. The unit should be completely inspect-
ed for evidence of shipping damage and shipment completeness
at the time of receipt from the carrier and before the bill of lading
is signed.
NOTE:
R
is not responsible for lost or damaged freight. Any vi-
sual damage to the packaging materials should be made clear to
the delivering carrier.

2.3 Unpacking

Carefully unpack the unit, pay particular attention not to damage
the unit enclosure when cutting away packaging materials.
After unpacking, a close inspection of the unit should be made
to ensure that there is no evidence of damage. The freight carrier
should be notified immediately if any damage is detected.
The following accessories come standard with each unit and are
either packed separately within the unit's shipping container or
are factory installed on the unit:
− Pressure/Temperature Gauge
− ASME Pressure Relief Valves
− Condensate Drain Traps
− Outdoor Sensor
− System Supply Sensor (length: 20")
− Connection Cable between 905PB internal display and
905MN boards
− Venting adapter 10" down to 8"
− Stainless steel air intake adapter 8"
When optional accessories are ordered, they may be packed with-
in the unit's shipping container, factory installed on the unit, or
packed and shipped in a separate container. Any standard or op-
tional accessories shipped loose should be identified and stored
in a safe place until ready for installation or use.

2.4 Site preparation

Ensure that the site selected for installation of the Array AR 3000
and AR 4000 Boiler includes:
− Access to AC Input Power at 230 VAC, Phase-Phase-Neutral,
60 Hz @ 24 FLA
− Access to Natural Gas line at a recommended minimum
pressure of 8 inches W.C. for 3,000,000 BTU/hr energy input
for the AR 3000 OR 4,000,000 BTU/hr energy input for the
AR 4000.
6
Array Boiler Model
R

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Array ar 4000

Table of Contents