SHEAR MOUNTING PROCEDURE
7. Extend the cylinder rod or bucket linkage and move into position as necessary to pin this connection. Install
shear supplied pin. It may be necessary to use a lifting device (overhead hoist, forklift, etc.) to position the
cylinder or linkage correctly.
8. Connect the hydraulic hoses to the manifold located on each side of the head. Remember to cap all hydrau-
lic hoses and fi ttings immediately to prevent contamination of the hydraulic system. Tighten the bolts to the
proper torque (refer to Split Flang Fitting Torque Tables on page 8-26).
9. On rotating models the following procedures are to be followed.
a. After installing a hydraulic circuit on the excavator, install additional hydraulic lines up the boom—
these will include two 1/2" (13 mm) diameter feed lines and one 1/2" (13 mm) diameter case drain
line. These will terminate at the end of the boom.
b. Install jump lines from the above hydraulic lines to the shear bulkhead or manifold fi ttings. Please
refer to the parts catalog for specifi c fl ow and pressure requirements; if in doubt, call Service (800-522-
5059).
10. Check to make sure all collars, fasteners, and other connecting hardware are secure before proceeding.
11. Lift the boom and slowly try the shear rotate function and shear open and close function (see Figure 3-3).
Watch for hydraulic oil leaks.
NOTICE
When installation is complete, slowly curl the
shear to tuck it under the boom. Check for
interference. Contact factory immediately if
any interference occurs.
MSD SABER SERIES SHEARS
continued
FIGURE 3-3
Installation
Section 3 Page 3