RGBlink M1 User Manual page 6

All-in-one scaling and vision mixing processor.
Hide thumbs Also See for M1:
Table of Contents

Advertisement

To protect users from electric shock, ensure that the chassis connects to earth via the ground
wire provided in the AC power Cord.
The AC Socket-outlet should be installed near the equipment and be easily accessible.
Unpacking and Inspection
Before opening M1 shipping box, inspect it for damage. If you find any damage, notify the
shipping carrier immediately for all claims adjustments. As you open the box, compare its
contents against the packing slip. If you find any shortages, contact your sales representative.
Once you have removed all the components from their packaging and checked that all the listed
components are present, visually inspect the system to ensure there was no damage during
shipping. If there is damage, notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your M1 should be clean, properly lit, free from static, and
have adequate power, ventilation, and space for all components.
M1
User Manual
5

Advertisement

Table of Contents
loading

Table of Contents