Chapter 2 Installing Your Product; Plugging In Signals; Plugging In Main Power; Turning On Your Product - RGBlink M1 User Manual

All-in-one scaling and vision mixing processor.
Hide thumbs Also See for M1:
Table of Contents

Advertisement

Chapter 2 Installing Your Product

2.1 Plugging in Signals

Connect signals to the product (ensure all devices are powered off first). Tighten connector
screws/locks where provided.

2.2 Plugging in Main Power

Connect IEC cable to device and plug into wall socket. Turn on power at wall socket.

2.3 Turning on Your Product

Turn on the power switch on the rear panel.
OLED display will show as below, completing initialization before loading the latest settings and
input/output configuration.
M1
User Manual
14

Advertisement

Table of Contents
loading

Table of Contents