Installation and Commissioning
3
Installation and Commissioning
Procedure / Steps
Table 3-1
Step
1. Insert the CP 443-5
Basic
Note
When using the universal rack as an extension rack, you require an IM with a communication bus link!
2. Attachment to
PROFIBUS
Note
When using the CR2 rack, the CPU and CP must be plugged into the same segment if you want to use
FDL/FMS connections.
3. Configuration
4. PG/PC Attachment
for Configuration
B3–10
www.gkbpx.com
Explanation / Meaning
The CP 443-5 Basic can be inserted in all racks with slots for P and K bus
attachment:
S
Central rack CR2
S
Universal rack UR1, UR2 or UR2H
as central rack
as expansion rack with rack no. 1–6
The CP 443-5 Basic cannot be operated in an ER1 or ER2 expansion rack
(no K bus link possible).
Suitable slots in the rack:
With the exception of the slots reserved for the power supply and IM-R, the
CP 443-5 Basic can be inserted in all slots with a P and K bus interface (in
the central or in an expansion rack no. 1–6).
Note the information in the General section of this manual.
Depending on the communication services being used, configuration involves
the following steps:
S
Node initialization
This is necessary in all situations. This assigns a PROFIBUS address
and bus parameters to the PROFIBUS CP. For details, refer to /4/
S
Configuring connections:
This is necessary when using the communication services, S7 functions
and FDL connections (SEND/RECEIVE interface). For details, refer to /5/
or /4/.
You can connect the PG when configuring the CP as follows:
S
via MPI
S
via LAN / PROFIBUS
The CP 443-5 Basic must already have a PROFIBUS address (for details
of node initialization, refer to /4/).
CP 443-5 Basic for PROFIBUS / Manual Part B3 –
C79000-G8976-C161-03
该文档是极速PDF编辑器生成,
如果想去掉该提示,请访问并下载:
http://www.jisupdfeditor.com/
Release 11/2002