Preparation Of Start-Up - WAGNER TwinControl 5-60 ABS Translation Of The Original Operating Manual

Electronic mixing ratio controller for 2k paints
Table of Contents

Advertisement

EDITION 04/2010
OPERATING MANUAL
6.2

PREPARATION OF START-UP

The following points should be noted before commissioning:
➞ Ensure earthing of the unit and all other conductive parts inside the work area.
➞ Connect spray gun without nozzle with high-pressure hose to the mixing unit and
secure with safety catch.
➞ Check that all material-conveying connections are correctly connected.
➞ Check that all air-conveying connections are correctly connected in accordance with
the pneumatic diagram provided.
➞ Visually check acceptable pressure of all system components.
➞ Check level of release agent in the pumps and top up if necessary.
➞ Provide a material container for A and B components, a container for fl ushing agent
and an empty container for return fl ow.
➞ Connect the system to the air supply.
Magnetic fields!
Danger of damage to electronic devices and magnetic data
carriers
SIHI_0137_GB
PART NO. DOC393831
Make sure that electronic devices and magnetic data carriers are
removed from the danger area.
CAUTION
TwinControl
.
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents