Transport and handling

Transport of the equipment, especially by road, must be carried out with by suitable ways and means for protecting the components from violent shocks,
humidity, vibration, etc.

Unpacking and checking

The components of the packaging must be disposed on in accordance with the regulations in force in the country of installation.
When you open the package, check that the equipment is undamaged and make sure all the components are present. If you find any defects or dam-
age, stop unpacking and consult the carrier, and also promptly inform the Service ABB.

Equipment weight

Device
Power module
Wiring box
Lifting
The power module
and the wiring box
01
must be in accordance to local regulations relating lifting limits per operator) or alternatively using suitable lifting equipment.
In order to make the power module and wiring box easier to manage, 4 handles
If lifting with ropes, M12 eyebolts can be fitted in the same holes.
Manual lifting (handles)
In case of manual lifting, for high height wall installation positions (>50cm floor distance from bottom side of the wiring box: this maximum
allowed height value is calculated considering a medium tall height of 170 cm for operator) it's mandatory to use a support plan (e.g. a
table) to place the equipment during the lifiting operation, to allow the change of hands position.
The use of the support plan is suggested also for <50cm height installation.
4A
4B
4C
1D
4D
6A
6B
6C
6D
<50
cm
Weight (kg)
Lifting points
70 kg
~55kg
must be lifted by minimum 2 operators (the number of required operators necessary to lift the equipment
02
A
4A
4B
4C
1D
4D
6A
6B
6C
6D
>50
cm
4
M12. Kit of handles
4
M12. Kit of handles
can be fitted into the designated holes.
04
Vertical lifting (eyebolts)
A
B
A
- 5 -
Holes or Eyebolts UNI2947
and eyebolts (to be ordered)
04
and eyebolts (to be ordered)
04
Horizontal lifting (eyebolts and lifting balancer)
*lifting balancer must be 20 cm longer (per side) than
the lifted device.
A
EN
B
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-100-tl

Table of Contents