15 June 2016
18. Wiring
should
attached with the use of
supplied tie wraps so
that the wiring will be
away
from
hot
surfaces
moving
components.
Once
the
attached and everything
is in place the positive
and negative terminals
can be attached to the
battery.
19. Make certain that all fuel lines, wiring harness' are fixed in place well.
20. Lower the vehicle and re-install the battery cables.
21. Take the truck for a test drive and measure pump output pressures. The pump
pressure sure idle at 17-19 psi.
Flow Specifications
Flowrate should be MINIMUM 2.5GPM(150GPH) @ 14VDC
OR
Filling a 1 gallon container every 24 seconds @ 14VDC
U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295
#1050305D 2003-2004½ Dodge Cummins FlowMAX Lift Pump Kit (I-00169)
be
contacting
and/or
wiring
is
Plant Address: 33541 MacLure Rd. Abbotsford, BC, Canada V2S 7W2
Phone: 604-853-6096 | Fax: 604-853-8749 | Internet: www.bd-power.com
BD Engine Brake Inc.
U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295
- 11 -