Installing The Controller; Connections; Pin Assignments - Burkert 1110 series Operating Instructions Manual

Digital industrial controller
Table of Contents

Advertisement

Available languages

Available languages

DIGITAL INDUSTRIAL CONTROLLER
3

INSTALLING THE CONTROLLER

The controller was conceived for installation in switch panels. On the controller,
first of all remove the retaining elements engaged on both sides by swivelling in
anticlockwise direction. Insert the controller, including the enclosed rubber seal, into
the insertion opening from the front. Then again engage the two retaining elements
in the bolts on the sides of the housing and screw in the threaded pin inside from the
rear.
Switch panel insertion opening (W x H):
Outer controller dimensions (W x H x D):
Controller weight:
Degree of protection:
Operating temperature:
Storage temperature:
ATTENTION!
4

CONNECTIONS

4.1

Pin assignments

Figure 2: Rear side of controller
6 - 1110
To ensure the electromagnetic compatibility (EMC) the screw
terminal TE (Technical Earth) must be connected to the earth
potential by a cable that is as short as possible (30 cm, 2.5 mm
2
92 x 92 mm
(+0,8 mm)
96 x 96 x 173 mm
3
960 g
IP 65 (front when using the
enclosed seal)
0 bis +50 °C
-20 bis +60 °C
TE connection
(Technical Earth)
2
)

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents