Logging; Pre-Start Check - ION GASCLAM 2 Software Manual

Continuous ground gas monitoring
Table of Contents

Advertisement

GasClam 2 Software Manual
When a Water Level Sensor is connected the "Water Level Sensor Connected"
box should be ticked.
The GasClam 2 records the water level in "meters below ground level" (mbgl).
In order to calculate this depth 2 parameters need to be entered:
Depth of the GasClam 2 below ground level.
Water Level Sensor length.
(See User Manual for details)
Pure water has a density of 1000 kg/m3 at 4°C. Borehole pressure
affects the water level reading but this is automatically corrected.
To save any changes do not forget to click the "Write settings to
GasClam 2" button, otherwise any changes made will not be
saved.

5. Logging

5.1. Pre-start check

Once the GasClam 2 has been setup for logging using the "Logging
Setup" window return to the "Main" window to check the settings.
GasClam 2 "friendly" Name
Power Supply Voltage
(is the battery fully charged)
Power Supply Type
Sample Count
Is logging memory empty if required?
Logging Interval (Sampling Every)
Vent Mode
"Closed" either "Vent Plug Inserted" or set to "Always
Closed" "Open" set to "Always Open
"Changing" set to "Once a day for..." or "Every..."
If all the settings are correct, logging can be started using either the Start Button Cable (see User Manual) or the
software start/stop button in the "Home" window.
Unrivalled
GasClam 2 Time and Date
Detection.
ionscience.com
Ion Science Ltd.

Advertisement

Table of Contents
loading

Table of Contents