GE TLE 160 User Manual page 85

Tle series 480vac ul/ s2b
Table of Contents

Advertisement

NOTE !
Ensure the LED 1 (Rectifier) is lit before carrying out this procedure.
It indicates that the DC-link 1 and DC-link 2 has reached 400Vdc (see screen MEASURES /
Rectifier)!
2. Connect the Battery on all Units by closing the
"External Battery Protections" and close, if
present, the "CB3 – External Battery switch"
(option).
NOTE !
Before performing the next procedure (3) make sure that the LED 3 (Booster/Battery
charger) is lit.
3. Insert the Inverter performing the "Inverter ON" command on first unit.
Perform the "Inverter ON" command from the screen:
Commands 1 / Inverter / ON.
Soft-start of Inverter, indicated with blinking LED 2 (Inverter).
At the end of Soft-start the LED 2 (Inverter) remains lit.
In case of sufficient output power, the output will transfer to Inverter.
LED ALARM turns Off and the LED LOAD PROTECTED must be lit.
Synoptic diagram of first unit
4. Insert the Inverter performing the "Inverter ON" command on all other units.
Do not start the next Inverter until the sequence of the previous ends.
Perform the "Inverter ON" command from the screen:
Commands 1 / Inverter / ON.
Soft-start of Inverter indicated with blinking LED 2 (Inverter).
At the end of Soft-start the LED 2 (Inverter) remains lit.
As soon as the output power of the Inverters is sufficient to supply the Load, the output of the units with
running Inverter will transfer to Inverter.
LED ALARM turns Off and the LED LOAD PROTECTED must be lit.
The Synoptic Diagram, on all UPS units, must display the status "LOAD SUPPLIED BY INVERTER".
Synoptic diagram of first unit
Modifications reserved
GE_UPS_USM_TLE_SUL_M16_M50_2bU_V010.docx
Critical Power
END OF PROCEDURE
Synoptic diagram of other units
Synoptic diagram of other units
User Manual TLE Series 160 - 500 UL S2B
Page 85/91

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents