5. Insert the Inverter performing the "Inverter ON" command on all other units.
Do not start the next Inverter until the sequence of the previous ends.
Perform the "Inverter ON" command from the screen:
Commands 1 / INVERTER / ON.
Soft-start of Inverter indicated with blinking LED 2 (Inverter).
At the end of Soft-start the LED 2 (Inverter) remains lit.
As soon as the output power of the Inverters is sufficient to supply the Load, the output of the units with
running Inverter will transfer to Inverter.
LED ALARM turns Off and the LED LOAD PROTECTED must be lit.
The Synoptic Diagram, on all UPS units, must display the status "LOAD SUPPLIED BY INVERTER".
Synoptic Diagram of first unit
6. Operation mode selection.
TLE Series 160 - 500 is delivered normally selected for permanent VFI operation.
If available, the eBoost™ Operation Mode can be enabled and the eBoost Start Time & eBoost Stop Time can
be programmed for each day of the week (see Section 6.4 SETUP / eBoost).
If available, the IEMi Operation Mode can be enabled and the IEMi Start Time & IEMi Stop Time can be
programmed for each day of the week (see Section 6.4 SETUP / IEMi).
NOTE !
The Battery must be charged for at least 10 hours, in order to ensure the full backup
runtime in case of a Utility Failure.
Modifications reserved
GE_UPS_USM_TLE_SUL_M16_M50_2bU_V010.docx
Critical Power
END OF PROCEDURE