Setting up Parameters via the Keypad

PID Sensor Setup

Optional: To view the Estimated Run Time, select this field (by pressing ▲/▼ Arrows) and press
4.
Enter
 NOTE: To extend the logging time, turn a logged measurement(s) to "Off" and/or change the
5.
Press On/Off/Esc
PID Sensor Setup
For best PID testing results, it is recommended to add a correction factor to the relevant VOC you intend
to measure. Refer to the PID correction factors table in
Additionally, the PID setup screen is used to set the ppb zero cal to either enabled or disabled
(if applicable).
. The estimated run time screen will appear.
log interval. Then, re-check the estimated run time.

Figure 3-6: Estimated run time for logging screen

repeatedly to return to the Start screen.
Estimated run time
**NOTE: To increase the total duration, log
only one or two measurements
and/or change the log interval.
Appendix C
for more details.
EVM Series User Manual

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EVM-7 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Evm-3Evm-4

Table of Contents

Save PDF