TSI Quest EVM-7 User Manual page 3

Evm series. environmental monitor
Table of Contents

Advertisement

iii
Dangers, Warnings, & Cautions
Dangers, Warnings, & Cautions
Failure to observe the following procedures may result in serious personal injury:
 Not for use in Explosive or Hazardous locations. This product is NOT Intrinsically Safe.
 Contains built-in lithium ion battery pack. DO NOT incinerate or dispose of in fire.
 DO NOT disassemble, alter, or re-construct the li-ion battery.
 Contains Class 3B visible laser radiation source (658 nm, nominal 5 mW). DO NOT look
directly into beam or view with telescopic devices.
 This instrument will NOT detect natural gas.
 Read the manual before operation.
 DO NOT store in temperatures exceeding 60°C (140°F) and in direct sunlight.
 DO NOT immerse in liquids.
 The Sensors and batteries in this instrument have limited shelf-life, even if never used.
 DO NOT disassemble, service, or clean the optical engine internal components while power is
applied. The laser source can hurt you.
General
 Condensation may damage your instrument and its sensors.
 A non-condensing environment is required for proper measurements.
 DO NOT charge batteries outside the range of 0°C to 40°C (32°F to 104°F).
 Battery run-time may be somewhat reduced at lower than 20°C (68°F) temperatures.
Temp/RH/Dew Point
The internal Temp/RH sensor in this instrument is not designed for use in bright sunlight or in the
presence of a strong radiant heat sources. It is intended primarily for indoor use. It is not equivalent
to a protected dry-bulb thermometer.
ENVIRONMENTAL MONITOR
DANGER!
WARNING!
Caution!
Caution!
EVM SERIES
EVM Series User Manual

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EVM-7 and is the answer not in the manual?

This manual is also suitable for:

Evm-3Evm-4

Table of Contents

Save PDF