(3) Refer to "7. Wiring Instructions" and connect the wires for the power line, M-NET transmission line, and meter input signal lines.
Meter input
signal lines
M-NET
Junction
terminal
block
Watt-hour
meter
Diagram Image (Installed within a Control Panel)
7

Wiring Instructions

7-1. Terminal Diagram

LED17
M-NET
Power on
M-NET
Address
Status LEDs
LED
M-NET
A / B / S
CN17
Power line
PI controller
24 VDC
Power
source
-V
FG
L
N
10s
1s
SW06
SW07
(CPU power on)
11/ 12/ 13/ 14/ 15/ 16
PAC-SC50KUA
M-NET
Function Settings
SW01
SW03
Pulse Input
CN10
/ 11
/ 19
/ 20
7
Caution: Perform wiring so that the
terminal block is not strained.
If strained, use a wire guide or
junction terminal to alleviate the
stress on the terminal block.
Note:
• The input signal line should not come
into contact with or be installed
alongside the M-NET transmission line
and power supply line.
• Connecting an Uninterruptible power
supply (UPS) to the 24 VDC power
supply is recommended in order to
prevent the loss of pulse data in the
event of a power failure.
* The wiring in the diagram has been simplified.
SW02
SW08
SW09
24 VDC Power Supply
V+ / V- / FG
CN16