Install the system into a rack
CAUTION
Data Domain systems are heavy. Always use two people or a mechanical lift to
move a system.
Figure 4 Warning about lifting the system
CAUTION
The system controller should be installed in the pre-defined location for the
l
system controller in the rack to comply with Data Domain rack mounting
guidelines.
Do not apply AC power to the system controller until all expansion shelves
l
and cables are installed.
Ensure the PSNT label, which is in a slot just beneath the power supply on the
l
rear of the chassis is not damaged or snagged during the installation of the
system into the rack.
Procedure
1. From the front of the rack, lift the chassis to install the system in the rack in the
correct location.
2. Slide the unit onto the rails and push it fully into the cabinet until the mounting
holes on the unit are flush with the NEMA channel.
Install the System in the Rack
Install the system into a rack
17
Need help?
Do you have a question about the Data Domain DD6300 and is the answer not in the manual?
Questions and answers