AXTAP2200 SERIES WITH BT TAP HARDWARE INSTALLATION

The following instructions illustrate a typical hardware installation for the AXTAP2200 Series Dual-Link
Aggregating Tap, as shown by the example below in Figure 32.
AXTAP2206BT-BT
Figure 40.
Figure 41. AXTAP2206BT-BT Link Aggregation Tap connectivity diagram
IMPORTANT: To ensure copper tap failsafe functionality, hardware installation is not complete at the final loca-
tion until the network end-device link has been verified prior to powering the tap and the network
end-device link has been verified for the powered tap condition.
1. (AXTAP2200 SERIES WITH BT TAP) Prior to powering the tap, connect both straight through copper net-
work cables to the TAP RJ45 ports. Do not exceed 100 meters cable length between end-devices. Ensure
that link is established between both end-devices.
Figure 42. Dual-Link Aggregation Tap - On loss of power, relay is closed
2. Two power supplies are provided. Use of the second power supply is strongly recommended to assure
uninterrupted monitoring. Connect both power supply barrel connectors into the power ports. Plug the
power supplies into the external power source. Connect the second power supply to a different external
power source circuit than the first power supply to eliminate power as a single point of failure. The POWER
1 and 2 LEDs illuminate indicating power 1 and 2, respectively, are on. Either LED not illuminated indicates
a defective power source and immediate replacement is required to insure redundant power integrity.