Mira PLATINUM Installation Manual page 31

Hide thumbs Also See for PLATINUM:
Table of Contents

Advertisement

Run cold water through
(approximately 2 minutes) and
check entire installation for water
leaks. Press " " to turn shower
off. Fit the second hose washer
and showerhead.
Press " " to turn shower on.
Test operation of shower by
increasing/decreasing both
WHPSHUDWXUH DQG ÀRZ FRQWUROV
6HH 8VHU *XLGH IRU IXOO GHWDLOV
Test operation of showerhead
spray modes. (See Showerhead
8VHU *XLGH IRU IXOO GHWDLOV
5HIHU WR 8VHU *XLGH IRU IXUWKHU LQVWUXFWLRQV RQ KRZ WR XVH WKH VKRZHU
The Wireless Controller factory default settings are as follows:
0D[LPXP 6KRZHULQJ 7HPSHUDWXUH
Eco Mode
:DUP8S 0RGH
&ORFN
Clock Display
°C
= Off
2II
 ZKHQ EDWWHULHV FRQQHFWHG
= On
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents