Installation
Figure 2-27. Accessory Tray Installation
Tab
Notch
2.5.
Leveling Treadmill
1. Ensure that all feet touch the floor: Loosen the 19mm Jam Nut and
the 14mm Adjustment Nut using open end or adjustable wrench
and turn the Adjustment Nut until the foot touches the floor (Figure
2-28).
Figure 2-28. Leveling Feet
14mm Adjustment
Nut
26
Leveling Treadmill
19mm Jam Nut
Increase Height
Decrease Height