(Installation on a carpeted surface is not recommended.) ASSEMBLY You should use two people for the assembly of the Grayson Sauna. The wall and roof sections are large and need two people to lift and hold in place during assembly. BASIC TOOLS...
Page 3
1. Connect the 4 FLOOR RISERS Your existing floor will serve as the floor for your sauna. The pre-fabricated rails and risers will be placed on your existing floor and provide the structural support for the sauna room.The 4 floor risers are pre-drilled and are assembled with 2”...
Page 4
ILLUSTRATION 1 The 8 wall sections, A– H, will be positioned in the grooves of the completed wall support section as shown. Completed Wall Support 4. Position WALL SECTION A Position Wall Section A in the groove of the rail on the left rear side of the sauna according to the guide on ILLUSTRATION 1.
Page 5
7. Position WALL SECTION C Position Wall Section C on the right rear side of the sauna according to the guide on ILLUSTRA- TION 1. NOTE: Wall Section C will attach to Wall Sec- tion B by way of the tongue and groove profile but will not be fastened with screws.
Page 6
11. Install FILLER STRIP Screw the filler strip to Window Section F to fill the gap between Window Sections F and Door Section H. Trim pieces will later be installed over this joint. NOTE: Due to the inherent variations in lumber dimensions, this gap may not be completely filled by the filler piece.
Page 7
15. Build ROOF SUPPORT Assemble 4 roof support rails by angle-screwing with 2” screws through the pre-drilled holes. NOTE: Be sure that the rails are square and level and that the screw head does not protrude into the groove. Completed Roof Support 16.
Page 8
19. Attach TRIM Find the package of 4 Roof Trim pieces and attach to the raw edge of the Roof Sections with finish nails. Find the package of 2 Wall Trim pieces and attach over the filler strip between sections F & H. NOTE: The trim pieces are not pre-drilled.
Page 9
25. Attach LONG BACK 23. Measure Height 24. Drill Hole for LIGHT REST for LONG BACK CORD Use 2” screws and pre- The LED lighting comes in- REST drilled holes to attach the stalled on the back of the Back Measure the desired Long Back Rest to Wall position at which you...
28. HEATER INSTALLATION Mount the heater as shown in the manufacturer's instructions. The heater should be mounted on Wall Section E, over the vents and 7” from the floor of the sauna. All the necessary hardware is supplied with the heater. Drill a hole below and behind the heater to run the wire and/or conduit according to local electrical codes.
Page 11
33. Attach DOOR KNOB Take the two sections of the door knob and insert the thread through the hole in the door. Tighten so that handles are snug to glass. NOTE: Hand tighten only and be sure rubber gas- ket is between knob and glass. Attach Door Knob on Door...
OPERATION After the sauna has been installed, sweep down the inside to remove any sawdust and wood shavings, and then vacuum completely. Using a damp cloth and warm water, wipe down the entire sauna including the benches to remove any remaining dirt, dust and debris. Rinse off the sauna stones and install them in or on the heater in accordance with the heater manufacturer’s instructions.
Need help?
Do you have a question about the Grayson and is the answer not in the manual?
Questions and answers