Download Print this page
Moxa Technologies NPort IA5250I/5250I-T Series Quick Installation Manual
Moxa Technologies NPort IA5250I/5250I-T Series Quick Installation Manual

Moxa Technologies NPort IA5250I/5250I-T Series Quick Installation Manual

Advertisement

Quick Links

NPort IA5250I/5250I-T Series
Quick Installation Guide
First Edition, October 2009
1. Overview
NPort IA device servers deliver easy and reliable serial-to-Ethernet
connectivity for the industrial automation market. The servers support
several operation modes—TCP Server, TCP Client, UDP, Real COM,
Pair Connection, and Ethernet Modem—ensuring the compatibility of
network software, and are an ideal choice for connecting
RS-232/422/485 serial devices, such as PLCs, sensors, meters, motors,
drives, barcode readers, and operator displays. NPort IA5250I/5250I-T
device servers come with a compact and rugged DIN-Rail mountable
casing.
2. Package Checklist
Before installing NPort IA device servers, verify that the package
contains the following items:
• 1 NPort IA Series Device Server
• Documentation and Software CD
• NPort IA Series Quick Installation Guide
Optional Accessories
DR-4524
45W/2A DIN-Rail 24 VDC Power Supply with
universal 85 to 264 VAC input
DR-75-24
75W/3.2A DIN-Rail 24 VDC Power Supply with
universal 85 to 264 VAC input
DR-120-24
120W/5A DIN-Rail 24 VDC Power Supply with 88
to 132 VAC/176 to 264 VAC input by switch
Notify your sales representative if any of the above items is missing or
damaged.
3. Hardware Introduction
NPort IA5250I/5250I-T device servers are used to control
RS-232/422/485 devices for industrial automation environments. NPort
5250I/5250I-T has 2 RS-232/422/485 male DB9 serial ports with 2KV
isolation for all interfaces.
— 1 —
NPort IA5250I/5250I-T Appearance
Dual power input
and relay output
Reset Button—Press the Reset button continuously for 5 sec to load
factory defaults: Use a pointed object, such as a straightened paper clip or
toothpick, to press the reset button. This will cause the Ready LED to
blink on and off. The factory defaults will be loaded once the Ready LED
stops blinking (after about 5 seconds). At this point, you should release
the reset button.
NPort IA LED Indicators (front panel)
Name
PWR1,
PWR2
Ready
Ethernet
P1, P2
P/N: 1802051500212
Top View
Front View
Bottom View
PWR1
PWR2
1
RDY
V2+
P1
V2
P2
LED
Indicators
V1+
V1
Reset
Ethernet 1
Ethernet 2
Reset
RS-232/422/485
Copper
Ethernet
IA
5250
I
Color
Function
Power is being supplied to power input PWR1,
red
PWR2.
Steady on:
Power is on and NPort IA is booting
up.
red
Blinking:
Indicates an IP conflict, the DHCP
or BOOTP server did not respond
properly, or a relay output occurred.
Steady on:
Power is on and NPort IA is
functioning normally.
green
Blinking:
The device server has been located
by Administrator's Location
function.
off
Power is off, or a power error condition exists.
Orange 10 Mbps Ethernet connection.
Green 100 Mbps Ethernet connection.
off
Ethernet cable is disconnected, or has a short.
orange Serial port is receiving data.
green Serial port is transmitting data.
No data is being transmitted or received through
off
the serial port.
— 2 —
4. Hardware Installation Procedure
STEP 1: After removing NPort IA from the box, the first thing you
should do is connect the power adaptor. Connect the 12-48
VDC power line with NPort IA's terminal block, or connect
the DIN-Rail power supply with NPort IA's terminal block.
STEP 2: Connect NPort IA to a network. Use a standard
straight-through Ethernet cable to connect to a Hub or
Switch. When setting up or testing NPort IA, you might find
it convenient to connect directly to your computer's Ethernet
port. In this case, use a cross-over Ethernet cable.
STEP 3: Connect NPort IA's serial port to a serial device.
STEP 4: NPort IA is designed to be attached to a DIN-Rail or
mounted on a wall. The two sliders on NPort IA's rear panel
serve a dual purpose. For wall mounting, both sliders should
be extended. For DIN-Rail mounting, start with one slider
pushed in, and the other slider extended. After placing the
NPort IA on the DIN-Rail, push the extended slider in to
lock the device server to the rail. The two placement options
are illustrated in the accompanying figures.
Wall Mount
DIN-Rail
Push here to lock
to the DIN-Rail
5. Software Installation Information
To install NPort Administration Suite, insert the Document &
Software CD into your computer's CD-ROM drive. Once the
installation window opens, click on the Installation Administration
Suite button, and then follow the instructions on the screen. To view
detailed information about NPort IA Administration Suite, click on
the Documents button, and then select NPort IA5250I/5250I-T Series
User's Manual to open the pdf version of this user's manual.
— 3 —

Advertisement

loading

Summary of Contents for Moxa Technologies NPort IA5250I/5250I-T Series

  • Page 1 3. Hardware Introduction Power is off, or a power error condition exists. the Documents button, and then select NPort IA5250I/5250I-T Series NPort IA5250I/5250I-T device servers are used to control User’s Manual to open the pdf version of this user’s manual.
  • Page 2 6. Pin Assignments and Cable Wiring Female DB9 to Male DB25 Male DB9 Female DB9 Male DB25 Female DB25 RS-232/422/485 (Male DB9) Pinouts 1 2 3 4 5 RS-232 NPort IA Device Cable Wiring 9 pins 25 pins 6 7 8 9 RS-422/ RS-232 RS-485 (2W)