Table of Contents

Advertisement

Installation Manual

for Wallbox G3
www.ies-synergy.com

Advertisement

Table of Contents
loading

Summary of Contents for IES Wallbox G3

  • Page 1: Installation Manual

    Installation Manual for Wallbox G3 www.ies-synergy.com...
  • Page 2 IES Synergy, given in writing. You also agree not to establish any hypertext links to this document or its content. IES Synergy does not grant any right or license for the per- sonal and noncommercial use of the document or its content, except for a non-exclusive license to consult it on an “as is”...
  • Page 3: Table Of Contents

    Lock the Wallbox on its bracket Close the side door Connector’s holster installation Connector holster installation Hold the connector on holster Switch off external power supply Electrical connection Checking the Electrical Requirements Grounding Instructions Open the door Remove Input plate with cable gland www.ies-synergy.com...
  • Page 4 3-phase P1/P2/P3 + N + GND 3x380-480V with power metering Close input plate with cable gland Close the door Switch on external power supply Commissioning SIM card Customer SIM card installation First booting Booting errors Power limitation Protecting the environment Recycling Packaging End-of-Life Recycling www.ies-synergy.com...
  • Page 5: Safety Notes

    Electrical equipment should be installed, operated, serviced, and maintained only by qualified personnel. No responsibility is assumed by IES Synergy for any consequences arising out of the use of this material. A qualified person is one who has skills and knowledge related to the construction and operation of electrical equipment and its installation, and has received safety training to recognize and avoid the hazards involved.
  • Page 6: About The Manual

    This guide aims to provide informations needed for installation and end-of life of the charging station IES Wall- box G3. This guide must be read in integrality with others related documents. This guide is intended for quali- fied personnel to install on the charging stations.
  • Page 7: General Safety Instructions

    • Do not open the front cover at any time while input power is present. • Do not operate the unit while the cabinet door is opened or unlocked. Failure to follow these instructions may result in death, serious injury or equipment damage. www.ies-synergy.com...
  • Page 8: Overview

    Installation Manual DIM016055-EN 4. Overview External view tooltip Position Description Antennas 7” touchscreen display RFID reader Emergency Stop button Input cable Output cable Key locker Connector holster Output DC coupler Note: May change depending on version or technical modification www.ies-synergy.com...
  • Page 9: Internal Door View

    Installation Manual DIM016055-EN Internal door view Position Description Optionnal modem board RFID reader board Modem board Display board OCPP board Note: May change depending on version or technical modification www.ies-synergy.com...
  • Page 10: Internal View - Upper Level

    Hood stand Key locker Input plate + cable gland Emergency stop button Heat exchanger Extractor fan Power module lid CCU board Distribution board Output plate + cable gland Key locker Note: May change depending on version or technical modification www.ies-synergy.com...
  • Page 11: Internal View - Lower Level

    Emergency stop button Heat exchanger Extractor fan 8kW Module - slave 1 8kW Module - slave 0 8kW Module - master Distribution board Output plate + cable gland Key locker Note: May change depending on version or technical modification www.ies-synergy.com...
  • Page 12: Specification

    Mains supplies 3-phase P1/P2/P3 + N + GND 3x380-400V (24kW) with power metering Mains 3-phase voltage range 380-400 V ± 10% Earthed electrical system TT or TN Frequency range 50/60 Hz ± 10% Nominal input current 40-32A Maximum input current www.ies-synergy.com...
  • Page 13: Technical Specification

    1.5Mohms permanent Internal resistance Ri of the measuring circuit 750Kohms continuous measurement 300Kohms during simultaneous switching measurement Measurement method Continuous and switching measurement resistor method Measuring current Im < 1,4mA at RF=0 Measurement range (Ran) 20Kohms…300Kohms Relative uncertainty ±15% www.ies-synergy.com...
  • Page 14 Max output current will be adapted versus maximum carrying current of the vehicle plug. Output current can be even reduced with the power derating versus temperature. Potential derating above 35°C. CE marking affixed on the product attest the conformity of the product with applicable requirements of rele- vent Community harmonization legislation. www.ies-synergy.com...
  • Page 15: Compliance

    Installation Manual DIM016055-EN Compliance Derating As a direct correlation exists between the current and ambient temperature a derating curve is provided for all charging station. 35°C 40°C 45°C 50°C 55°C Minutes before derating =370V & I =65A www.ies-synergy.com...
  • Page 16: Handling And Storage Instructions

    Transport Throughout the transport phase, take all necessary measures to keep the pallet stable. Equipment Handling Wallbox G3 charging station is a 66kg equipment. It must be handled by two people minimum. NOTICE RISK OF DAMAGE TO THE CHARGING STATION •...
  • Page 17: Installation

    Note: The manufacturer cannot be held responsible for failure to follow the instructions given in this instruc- tion sheet. NOTICE PREMATURE AGEING OF THE CHARGING STATION • Do not install charging stations outside where they are exposed to direct sunlight and inclement weather. Failure to follow these instructions can result in accelerate power derating. www.ies-synergy.com...
  • Page 18: Unscrew Lid Of Crate

    Unscrew lid of crate 1. Remove four (4) phillips screws from bottom of crate and lift crate sidewalls upwards - position 1 Unpacking Wallbox 1. Remove the lid of crate. You will use it to put the charging station. www.ies-synergy.com...
  • Page 19: Open The Side Door

    Installation Manual DIM016055-EN Open the side door 1. Remove the screw (1) on side door - position 1 2. Remove the side panel Unlock Wallbox bracket 1. Remove the nuts (3) on bracket’s studs - position 1 www.ies-synergy.com...
  • Page 20: Remove Wallbox Bracket

    Installation Manual DIM016055-EN Remove Wallbox bracket 1. Remove the charging station from its bracket Note: Charging station must be handled by two peo- ple minimum. www.ies-synergy.com...
  • Page 21: Wall Mounting

    • Fasteners should be countersunk head type concrete screws or sleeve anchors, 6mm with a minimum length of 50mm Install Wallbox bracket 1. Using bracket as a template, level and mark drill holes 2. Place the anchors and attach the bracket to the wall with screws (8) - position 1 www.ies-synergy.com...
  • Page 22: Install Wallbox

    1. Lift the charging station onto its mounting bracket. Note: Due to the charger weight, two people or lifting equipment are required to lift and handle the charging station. Lock the Wallbox on its bracket 1. Tighten the nuts (3) on bracket’s studs - position 1 www.ies-synergy.com...
  • Page 23: Close The Side Door

    Installation Manual DIM016055-EN Close the side door 1. Close the side panel 2. Tighten the screw (1) on side door - position 1 www.ies-synergy.com...
  • Page 24: Connector's Holster Installation

    1. Using bracket as a template, level and mark drill holes 2. Place the anchors and attach the bracket to the wall with screws (8) - position 1 Note: Fasteners should be countersunk head type concrete screws or sleeve anchors, 6mm with a mini- mum length of 50mm www.ies-synergy.com...
  • Page 25: Hold The Connector On Holster

    Installation Manual DIM016055-EN Hold the connector on holster 1. Hold the DC output couplet on the connector hol- ster www.ies-synergy.com...
  • Page 26: Switch Off External Power Supply

    HAZARD OF ELECTRIC SHOCK, EX- PLOSION, OR ARC FLASH • Be sure the supply power is off before starting installation • Make sure nobody can switch on power during installation Failure to follow these instructions will result in death or serious injury. www.ies-synergy.com...
  • Page 27: Open The Door

    HAZARD OF ELECTRIC SHOCK, EX- PLOSION, OR ARC FLASH • Be sure the supply power is off before starting installation • Make sure nobody can switch on power during installation Failure to follow these instructions will result in death or serious injury. www.ies-synergy.com...
  • Page 28: Pass The Power Cable

    HAZARD OF ELECTRIC SHOCK, EX- PLOSION, OR ARC FLASH • Be sure the supply power is off before starting installation • Make sure nobody can switch on power during installation Failure to follow these instructions will result in death or serious injury. www.ies-synergy.com...
  • Page 29: Ac Input Configuration

    HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH • Be sure the supply power is off before starting installation • Make sure nobody can switch on power during installation Failure to follow these instructions will result in death or serious injury. www.ies-synergy.com...
  • Page 30: 3-Phase P1/P2/P3 + N + Gnd 3X380-480V

    1. Remove 15mm of insulation from the end to the power cable to be connected to the internal circuit breaker 2. Connect ground wire to the AC input configuration board - position 1 3. Connect each phase to the AC input configuration board - position 2 www.ies-synergy.com...
  • Page 31: Single Phase P + N + Gnd 1X220-240V

    2. Connect ground wire to the AC input configuration board - position 1 3. Connect neutral to the AC input configuration board - position 2 4. Connect each phase to the AC input configuration board - position 3 www.ies-synergy.com...
  • Page 32: Close Input Plate With Cable Gland

    Failure to follow these instructions will result in death or serious injury. Close the door 1. Remove the door stand - position 1 2. Close the door - position 2 3. Lock the door (2 keylocks) - position 3 www.ies-synergy.com...
  • Page 33: Switch On External Power Supply

    Installation Manual DIM016055-EN Switch on external power supply 1. Access to external circuit breaker 2. Switch on external circuit breaker Note: Charging station is now powered, starts and performs a self-test www.ies-synergy.com...
  • Page 34: Commissioning

    During the booting, If the display does not turn on, please see the maintenance manual. After booting, check on backend server if the charging station is connected. If the charging station is not con- nected to the backend server, please see the maintenance manual. www.ies-synergy.com...
  • Page 35: Booting Errors

    Usually 230V in Europe. CurrentInputLimit The maximum current allowed by the power supply installation (value of the circuit-breaker installed outside the charger). Refer to your backend server instructions to know how to change these configuration parameters. www.ies-synergy.com...
  • Page 36: Protecting The Environment

    Products have been designed so that their components can be processed by conventional procedures: decon- tamination where this is recommended, reuse and/or dismantling in order to improve recycling performance, and crushing to separate out the rest of the materials. www.ies-synergy.com...
  • Page 37 Installation Manual DIM016055-EN Notes www.ies-synergy.com...
  • Page 38 Installation Manual DIM016055-EN Notes www.ies-synergy.com...
  • Page 39 Installation Manual DIM016055-EN Notes www.ies-synergy.com...
  • Page 40 IES Synergy 615, Avenue de la Marjolaine 34130 Saint Aunès France Head office: Tel : +33 (0)4 99 13 62 80 Fax : +33 (0)4 99 13 62 81 As standards, specifications, and designs change from time to time, please ask for confirmation of the information given in this publication.

Table of Contents