E. Measuring Standards
Vertical and horizontal measurements listed in the vent
diagrams were made using the following standards:
• Pipe measurements are shown using the effective length
of pipe. See Section 12.A for information on effective
length of pipe components.
• Horizontal terminations are measured to the outside
mounting surface (flange of termination cap) (see Figure
4.6).
• Vertical terminations are measured to top of last section
of pipe. See Figure 4.7.
• Horizontal pipe installed level with no rise.
Figure 4.6 Measure to Outside Mounting Surface
Figure 4.7. Measure to Top of Last Section of Pipe
MEASURE TO SHADED SURFACE
(OUTSIDE MOUNTING SURFACE)
Heat & Glo • SL-5, SL-7, SL-9 Installation Manual • 2392-980 Rev. L • 6/17
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-7lpSl-5lpSl-7Sl-9

Table of Contents