Shutdown/Disassembly; Switching Off The Unit; Uninstalling The Device - Kaco blueplanet 5.0 TL3 Operating Instructions Manual

Hide thumbs Also See for blueplanet 5.0 TL3:
Table of Contents

Advertisement

Shutdown/Disassembly

11
Shutdown/Disassembly
11.1

Switching off the unit

DANGER
Lethal voltages are still present in the terminals and cables of the inverter even after the
inverter has been switched off and disconnected.
Severe injuries or death will occur when touching the cables and terminals in the inverter.
When there is solar radiation, DC voltage will be present at the open ends of the DC cables. Arcing
may occur if the DC cables are disconnected while they are still live.
It is absolutely essential that the shutdown sequence be carried out in the correct order.
After shutdown, wait at least five minutes before working on the inverter.
When working on photovoltaic modules, in addition to disconnecting from the grid, always discon-
nect the DC main switch on the generator junction box at all poles (or the DC plug connectors).
A sole disconnecting off the grid voltage is not sufficient!
CAUTION
Risk of burns from hot housing components.
Coming into contact with the housing can cause burns.
Do not touch the housing surface or semiconductor during and immediately after operation.
Allow the device to cool down before touching the housing surface.
DANGER
Destruction of the DC plug connectors
DC plug connectors can be destroyed by arcing if disconnected while still live. It is absolutely essential
that the following shutdown sequence be carried out in the correct order:
1.
Switch off the grid voltage by turning off the external circuit breakers.
2. Switch off the PV generator using the DC isolator switch.
DANGER! The DC cables are still live!
3. Ensure that there is no voltage present on the grid connection terminals.
11.2

Uninstalling the device

Shut down the inverter.
1.
Open the connection area.
2. Remove the interface cable.
3. Detach DC connection plug.
4. Detach AC connection plug.
5. Open the cable fittings.
6. Pull out the cables.
»
The inverter is uninstalled. Proceed with disassembly.
KACO Operating Instructions blueplanet 5.0 TL3 - 10.0 TL3
EN
Page 55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents