Fujitsu PRIMERGY CX400 M4 Operating Manual page 41

Server enclosure
Hide thumbs Also See for PRIMERGY CX400 M4:
Table of Contents

Advertisement

Attaching the carrier rails to the server enclosure
Ê Identify the right and the left rail.
Figure 7: Attaching the right carrier rail
Ê Move the right carrier rail towards the server enclosure and position the
holes onto the positioning screws (1).The carrier rail must lock in the
corresponding hole.
Ê Push the carrier rail towards the front side until it locks into the supporting
holes nicely (2).
Figure 8: Fixing the carrier rail
Ê Fasten the carrier rail with two M4 screws (3).
Ê Repeat this procedure to install the left carrier rail.
CX400 M4
Operating Manual
Hardware installation
41

Advertisement

Table of Contents
loading

Table of Contents