installation flow
Figure 5-2 P to P
Start the Maintenance Tool
Configure the WT (master)
Configure the WT (slave)
Installing the WT
Installing the PoE PSE (master/slave)
Connecting Cables to the WT (master/slave)
Waterproofing WT Small lid
Testing
Check sheet
Finish
5-27