Package Checklist; Before You Install The Framesaver Dsl Unit - Paradyne FrameSaver DSL 9783 Installation Manual

Hide thumbs Also See for FrameSaver DSL 9783:
Table of Contents

Advertisement

When the Activation Certificate arrives, add the Activation Certificate Number to your
OpenLane SLM application's database. Activations can occur at any time, for as many
units as desired, until no activations remain for the certificate. When ready to activate
units, select the units to be activated and schedule the activations. The activations
occur when scheduled, and OpenLane updates the certificate information.
Contact your sales representative for additional information.

Package Checklist

In addition to these instructions, your package should contain the following:
FrameSaver DSL unit
Power cord with a wall-mount 120 VAC power transformer
Tie wrap for power cord strain relief
DSL network access cable with 6-pin connector
FrameSaver DSL 9783 Quick Reference (Document No. 9783-A2-GL10)
Be sure to register your warranty at www.paradyne.com/warranty.

Before You Install the FrameSaver DSL Unit

Make sure you have:
A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the FrameSaver unit
A clean, well-lit, and ventilated site that is free from environmental extremes
One-to-two feet of clearance for cable connections
A physical connection to the DSL network
An asynchronous terminal or PC (personal computer)
If desired, an operable Ethernet LAN (Local Area Network) connection for access
by an NMS (Network Management System)
Configuration information for the FrameSaver unit being installed or replaced
Appropriate cables:
— Ethernet cable
— Data port cable
— COM port-to-terminal or COM port-to-PC cable
Read the Important Safety Instructions beginning on page 16.
2

Advertisement

Table of Contents
loading

Table of Contents