Package Checklist; Before You Begin - Paradyne FrameSaver SLV 9664 Installation Instructions Manual

Hide thumbs Also See for FrameSaver SLV 9664:
Table of Contents

Advertisement

Package Checklist

Verify that your package contains the following:
-
FrameSaver SLV unit
-
Universal power supply, with an attached cable and ferrite choke
-
Power cord appropriate for the wall-plug standard in your country (depends on
model ordered).
-
(NT1) network cable
-
FrameSaver SLV 9664 Quick Reference (Document No. 9664-A2-GL10)
Additional cables may be ordered. See Cables You Can Order on page 3 when
ordering cables.
Be sure to register your warranty at www.paradyne.com/warranty.

Before You Begin

If you ordered a wall mounting kit (Feature No. 9001-F1-891) for your FrameSaver unit,
install the wall mounting before you start installing the unit. Follow the same guidelines
below when installing the wall mounting. Contact your sales representative to order this
feature.
Before starting the installation, make sure you have:
-
A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the FrameSaver unit.
-
A clean, well-lit, and ventilated site that is free from environmental extremes.
-
One to two feet of clearance for cable connections.
-
A physical connection to the ISDN Network Termination (NT1). The cable is
provided with the FrameSaver unit.
-
An asynchronous (async) terminal or PC (personal computer) to set up the unit.
-
Node IP Addresses and Subnet Masks (see your network administrator).
See the User's Guide for additional information on:
H
Troubleshooting
H
Technical Specifications
H
Connectors, Cables, and Pin Assignments
2

Advertisement

Table of Contents
loading

Table of Contents