Water Heater Installation; Condensate Drain Installation - State Water Heaters SUF 60120 THRU Instruction Manual

Series 300 & 301
Table of Contents

Advertisement

CONDENSATE DRAIN INSTALLATION

Installation must conform with these instructions and local building
codes.
Field supplied materials required for installation include:
Approved PVC cement and PVC primer.
1/2 inch PVC pipe - minimum length to equal the distance
between the water heater and a suitable building drain.
1/2 inch PVC fittings (elbows, couplings, and adapters)
necessary to install a condensate drain line between the
Exhaust/Condensate Elbow Assembly and a suitable
building drain.
Floor mounted standoffs to brace the drain line.
INSTALLATION NOTES
1. The condensate drains from the water heater's covered by
this instruction have PH levels between 4.3 and 5.0. Install
a commercially available neutralizing kit if required by local
codes. Lower PH levels are acidic. Do not connect a metal
condensate drain line, such as copper pipe, to the water heater
for this reason.
2. The field installed condensate drain line must not be less than
1/2 inch PVC in size.
3. The exhaust elbow has a built in condensate trap. Do not install
an additional trap in the condensate drain piping. DO NOT
remove, modify or alter the factory condensate trap.
EXHAUST/CONDENSATE
(VENT) ELBOW
PRESSURE PORT

WATER HEATER INSTALLATION

1/2" NPT
CONDENSATE
DRAIN
CONNECTION
CONDENSATE
CLEANOUT
Figure 53. Condensate Drain Installation
39
INSTALLATION INSTRUCTIONS
1. Ensure the water heater's Enable/Disable switch is in the
"Disable" position.
2. Install a 1/2 inch PVC condensate drain line between
condensate drain connection on the Exhaust/Condensate Elbow
and a suitable building drain. The condensate line must slope
to an open drain, see
Figure 53
3. Terminate the condensate drain piping with an elbow above the
drain. Ensure that any discharge will exit the condensate drain
line no more than 6 inches (15.2 cm) above a suitable building
drain, or external to the building, see
Note: In cold climates it is recommended the condensate
drain be terminated at a suitable drain inside the
building.
4. Ensure the condensate drain line is not elevated above the
condensate drain connection on the Exhaust/Condensate
Elbow, see
.
Figure 53
5. Brace the condensate drain line with floor-mounted standoffs
every three feet.
6. Ensure that the condensate drains freely during start up, see
(page 53).
Start Up
7. Condensate clean out cap must be on and tight when unit is
in operation.
CONDENSATE DRAIN
LINE - FIELD
INSTALLED
BUILDING
DRAIN
.
.
Figure 53
DRAIN LINE TO
TERMINATE NO
MORE THAN 6
INCHES (15.2 cm)
ABOVE DRAIN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suf 100250

Table of Contents