Connecting Power Optimizers - SolarEdge SE3000US Installation Manual

Single phase inverter
Table of Contents

Advertisement

The following shows the required clearance on the top of the power optimizer.
Figure 6: Clearance – Side View

Connecting Power Optimizers

To connect these power optimizers to the PV modules:
WARNING!
Verify that you have identified the inputs and outputs correctly. Do not connect PV
modules to power optimizer outputs.
Vérifiez que vous avez identifié les entrées et sorties correctement. Ne pas
connecter des modules PV aux sorties des optimiseurs de puissance.
NOTE:
The power optimizer has reverse polarity protection. Even so, you must still verify
the correct polarity by checking the PV module's polarity with a voltmeter. Some
module manufacturers may use connector polarity that is different from that used
by SolarEdge power optimizer inputs.
The input connectors are shown in the figures above. The output connectors
are in the middle of each side.
SolarEdge Installation Guide – MAN-01-00002-1.6
1" (2.5 cm)
Installing the Power Optimizers
1" (2.5 cm)
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents